top of page
The Nelson’s Project

The Nelson’s Project

Renovation repaint with drywall repairs in the kitchen, bath, and hall. We protected the space, matched texture with skim-coat and dust-controlled sanding, then primed and applied two coats for a durable, even finish. Cabinets: degreased, sanded, bonding-primer, sprayed enamel (satin).

20131 Grove Street

1810 Holborn Project

Custom build: hang, tape, texture, prime, and two-coat finish through the entry and living areas. Former bedroom converted into a home theater.

The Jefferson’s Lake House

Exterior Painting

We prep right for a finish that lasts protect landscaping and windows, power-wash, scrape/sand failing paint, repair stucco/wood, caulk and seal gaps, spot/full prime, then apply two weather-rated coats matched to your surface (stucco, wood, or fiber-cement). Clean site daily, crisp lines, durable color, and a written warranty.

  • Facebook
  • Instagram
  • Yelp

Contact Us

931 10th Street
Modesto, CA 95354

(209) 953-0251

© 2025 by Buildridge Group All rights reserved

bottom of page